Divided highway “Ourense-Celanova " - Measuring span deflection nº2 of a level crossing
Measuring span deflection nº2 of a level crossing, located in the PK 100+9M of the divided highway Ourense-Celanova, during a load test required before commissioning of the structure. In general, it should measure at least the arrow in all vain centers and descent support lines.
This test is to prove the validity of the Terrestrial Laser Scanner for the measurement of arrows during the load tests in concrete bridges.